Skip to content
SetbackIQ

ADU rules in Denver, CO

Yes. The Denver Zoning Code sets the ADU's height, size and placement, and zoning review checks it.

ADUs are allowed in every Denver zone district that allows a new single-unit home.

Only a licensed contractor can pull an ADU permit; homeowner permits aren't allowed.

Rules last checked by a person on October 19, 2026. Guidance only; confirm with Denver before you build.

Urban (U-) single unit, two unit and row house

Height2 stories, 24 ft
LocationRear 35% of the lot depth
Side setback3 ft on lots 40 ft wide or less; 5 ft on wider lots
Rear setback5 ft (0 ft on an alley when garage doors don't face it)
Footprint864 sq ft on lots of 7,000 sq ft or less; 1,000 sq ft on larger lots

Urban Edge (E-) single unit, two unit and row house

HeightOption A: 1 story, 17 ft. Option B: 2 stories, 24 ft
LocationRear 35% of the lot depth
Side setback3 ft on lots 40 ft wide or less; 5 ft on wider lots
Rear setback5 ft with an alley or street behind; otherwise 5 ft (Option A) or 12 ft (Option B)
Footprint864 sq ft on lots of 7,000 sq ft or less; 1,000 sq ft on larger lots

Suburban (S-) single unit

HeightOption A: 1 story, 17 ft. Option B: 2 stories, 24 ft
LocationRear 50% of the lot depth
Side setback3 ft (lots 25 ft wide or less), 5 ft (under 62 ft), 7.5 ft (62 ft or wider)
Rear setback10 ft (Option A) or 20 ft (Option B)
Footprint864 sq ft on lots of 7,000 sq ft or less; 1,000 sq ft on larger lots

Suburban (S-) row house

Height2 stories, 24 ft
LocationRear 50% of the lot depth
Side setback3 ft on lots 25 ft wide or less; otherwise 5 ft
Rear setback5 ft

Good to know

  • A licensed contractor must apply; Denver doesn't issue homeowner permits for ADUs.
  • Only one ADU per primary home, and the ADU needs its own address.
  • In single-unit districts the owner must live in the main house when applying (not required when both are built at the same time).
  • Call 811 at least a few days before you dig footings or post holes. Utility locating is free.
  • HOA covenants and deed restrictions can be stricter than city rules. Check yours before you build.

Check your lot

What are you building?

Where to apply

Sources

  1. Denver CPD, Permitting an Accessory Dwelling Unit (ADU). Checked 2026-10-19.
    ADUs are allowed in all zone districts that allow new single unit dwellings. ADUs must be built by a licensed contractor... Only one ADU is allowed per primary dwelling unit.
  2. 44 CFR 59.1, definition of development (NFIP). Checked 2026-10-19.
    Development means any man-made change to improved or unimproved real estate, including but not limited to buildings or other structures...
  3. 44 CFR 60.3, floodplain management criteria. Checked 2026-10-19.
    Require permits for all proposed construction or other development in the community...