Skip to content
SetbackIQ

Do you need a permit for a fence in Montgomery County, MD?

It depends on size and placement.

Every new fence needs a permit, unless it replaces a permitted fence of the same kind, height and spot.

The height cap is 6 ft 6 in.

On corner lots, nothing over 3 ft within 15 ft of the intersection.

Rules last checked by a person on October 20, 2026. Guidance only; confirm with Montgomery County before you build.

Check your exact lot

Setbacks depend on your zoning district, and a flood zone can change the permit answer. Enter your address to see both.

What are you building?

Permits a fence can need in Montgomery County

PermitWhen it applies
Fence permitMontgomery County requires a permit for any new fence.
Floodplain development permitIf the lot is in a FEMA special flood hazard area, all development there needs a permit.

Limits that apply citywide

Maximum height6 ft 6 in
Corner lot3 ft max within 15 ft of the intersection
EasementsNot allowed in drainage or utility easements without the easement holder's approval

Local details

  • Call 811 at least a few days before you dig footings or post holes. Utility locating is free.
  • HOA covenants and deed restrictions can be stricter than city rules. Check yours before you build.

How to apply

Questions people ask

When does a fence need a building permit in Montgomery County?
Montgomery County requires a permit for any new fence. Replacing a permitted fence with the same kind, in the same spot and at the same height, doesn't need a new permit.
Where do I apply for a fence permit in Montgomery County?
Apply through DPS eServices, or call 311 (240-777-0311).

Sources

  1. Montgomery County DPS, Residential Fence Permit Process. Checked 2026-10-19.
    A permit is required to install any type of fence in Montgomery County... The maximum permitted height of a fence or wall is 6' 6".
  2. 44 CFR 59.1, definition of development (NFIP). Checked 2026-10-19.
    Development means any man-made change to improved or unimproved real estate, including but not limited to buildings or other structures...
  3. 44 CFR 60.3, floodplain management criteria. Checked 2026-10-19.
    Require permits for all proposed construction or other development in the community...