Do you need a permit for an ADU in Prince George's County, MD?

Yes. An ADU is a new dwelling unit and needs a building permit.

Maryland law required the county to allow ADUs on single-family detached lots by October 1, 2026.

The county's ADU law, CB-074-2026, was enacted September 29, 2026 and is reported to take effect November 16, 2026.

Rules last checked by a person on October 20, 2026. Guidance only; confirm with Prince George's County before you build.

Check your exact lot

Setbacks depend on your zoning district, and a flood zone can change the permit answer. Enter your address to see both.

What are you building?

Permits a ADU can need in Prince George's County

PermitWhen it applies
Building permitAn ADU is a new dwelling unit and needs a building permit.
Zoning reviewZoning decides whether the ADU is allowed and where it can go. Until CB-074-2026 takes effect (reported as November 16, 2026), ask DPIE in writing how it applies state law.Confidence: medium
Floodplain development permitIf the lot is in a FEMA special flood hazard area, all development there needs a permit.

Limits that apply citywide

Size (state minimum)Local rules must allow at least 75% of the house's size
Setbacks (state minimum)No stricter than for other accessory structures
Parking (state minimum)No extra space unless a parking study supports it

Local details

  • CB-074-2026, the county's ADU law, was enacted September 29, 2026. The Council record lists November 16, 2026 as the effective date. Confirm the date and the final standards with DPIE before you design.
  • Call 811 at least a few days before you dig footings or post holes. Utility locating is free.
  • HOA covenants and deed restrictions can be stricter than city rules. Check yours before you build.
  • Prince George's renamed its zones in 2022. If a plat or listing says R-55 or R-80, the lot is now RSF-65 or RSF-95.

How to apply

Questions people ask

When does a ADU need a building permit in Prince George's County?
An ADU is a new dwelling unit and needs a building permit.
Do I also need a zoning permit for an ADU in Prince George's County?
Zoning decides whether the ADU is allowed and where it can go. Until CB-074-2026 takes effect (reported as November 16, 2026), ask DPIE in writing how it applies state law.
Where do I apply for a ADU permit in Prince George's County?
Apply through DPIE Momentum permitting portal, or call (301) 636-2050.

Sources

  1. Prince George's County DPIE, What work is exempt from obtaining a permit?. Checked 2026-10-20.
    A one-story detached accessory structure on one- and two-family dwelling properties with less than 150 square feet of floor space not designed or intended for occupation or habitation and limited to 1 accessory structure only per property... A retaining wal…
  2. Maryland Department of Planning, ADU FAQ for local governments (HB 1466, 2025). Checked 2026-10-20.
    Local governments must authorize ADUs on lots with a single-family detached dwelling by October 1, 2026; allow ADUs up to 75% of the primary dwelling's size; apply setbacks no stricter than for accessory structures; and impose no extra parking unless a stud…
  3. Maryland ADU Guide, Prince George's County CB-074-2026 status (October 2026). Checked 2026-10-20.
    CB-074-2026 was enacted September 29 [2026]... [it] establishes zoning standards consistent with Maryland's statewide ADU law... [The Council record lists an effective date of November 16, 2026; confirm with DPIE.]
  4. 44 CFR 59.1, definition of development (NFIP). Checked 2026-10-19.
    Development means any man-made change to improved or unimproved real estate, including but not limited to buildings or other structures...
  5. 44 CFR 60.3, floodplain management criteria. Checked 2026-10-19.